CORE Interiors
  • Home
  • Who We Are
    • Our Story
    • Our Team
    • Our Culture
    • Haworth
  • What We Do
    • Our Services
    • Resources
  • Our Projects
    • Business
    • Education
    • Healthcare
    • Government
    • Nonprofit
    • Hospitality
  • Connect
  • Repair Request
  • More
    • Home
    • Who We Are
      • Our Story
      • Our Team
      • Our Culture
      • Haworth
    • What We Do
      • Our Services
      • Resources
    • Our Projects
      • Business
      • Education
      • Healthcare
      • Government
      • Nonprofit
      • Hospitality
    • Connect
    • Repair Request
CORE Interiors
  • Home
  • Who We Are
    • Our Story
    • Our Team
    • Our Culture
    • Haworth
  • What We Do
    • Our Services
    • Resources
  • Our Projects
    • Business
    • Education
    • Healthcare
    • Government
    • Nonprofit
    • Hospitality
  • Connect
  • Repair Request

Our Education Projects

CSUF Resnick Student Union

 Address:

5241 N Maple Ave, Fresno, CA 93740

Completed Date: 

2024

Project Team:

FF&E provided by - CORE

Contractor - McCarthy


 The Fresno State Resnick Student Union represents a major campus enhancement designed by Haworth and CORE Interiors and generously funded by the Resnick family. Despite a two-year construction period impacted by the COVID-19 pandemic, the interior was completed in just four months, resulting in an 84,000-square-foot facility that offers a vibrant, student-centered environment. The building features a welcoming first-floor lounge with food, coffee, and community gathering space, dedicated meeting areas on the second floor, and conference spaces and scholarship suites on the third floor. Serving as a dynamic hub for students and faculty, the Resnick Student Union stands as a lasting investment in student success and a proud addition to Fresno State University’s campus. 

Gregori High school Library

 Address:

Modesto, CA

Completed Date: 

2025

Project Team:

FF&E provided by - CORE


CORE Business Interiors is proud to partner on the modernization of the Gregori High School Library, creating a flexible and engaging learning environment that supports collaboration, independent study, and student wellness. The project includes the selection and installation of new library furnishings designed to enhance functionality, durability, and comfort while reflecting the evolving needs of today’s educational spaces.

The updated furniture package incorporates a variety of adaptable seating, study tables, collaborative work areas, and lounge spaces to encourage both focused learning and group interaction. Emphasis was placed on creating a welcoming, student-centered environment that promotes creativity, accessibility, and long-term performance within a high-traffic educational setting.

Through thoughtful planning, coordinated design solutions, and quality furnishings, the renovated library will serve as a modern hub for learning, technology, and community engagement for Gregori High School students and staff.

Davis high school library

 Address:

Modesto, CA

Completed Date: 

2025

Project Team:

FF&E provided by - CORE

 

CORE Business Interiors worked with Davis High School to provide new furniture solutions for the campus library, transforming the space into a flexible and student-focused learning environment. The project aimed to create a comfortable and functional setting that supports academic achievement, collaboration, and everyday student engagement.

The updated library includes a variety of modern furnishings such as collaborative tables, mobile seating, quiet study areas, and lounge spaces designed to accommodate multiple learning styles and activities. Furniture selections emphasized adaptability, durability, and ease of maintenance while helping create an open and welcoming atmosphere throughout the space.

The completed project delivers a refreshed library environment that encourages productivity, creativity, and connection, providing Davis High School students and staff with a contemporary space for learning and collaboration.

Davis high school Sports medicine

 Address:

Modesto, CA

Completed Date: 

2025

Project Team:

FF&E provided by - CORE

 

CORE Business Interiors partnered with Davis High School to furnish a new Sports Medicine classroom designed to support hands-on learning, collaboration, and student engagement. The project focused on creating a functional and adaptable educational environment that meets the unique needs of health science and athletic training programs.

The furniture solutions included flexible classroom seating, durable work surfaces, instructor stations, storage components, and collaborative learning areas to accommodate both instructional and practical activities. Selections were made to provide long-term durability, comfort, and mobility while supporting an active, interactive classroom setting.

The completed Sports Medicine classroom provides Davis High School students and staff with a modern learning environment that promotes education, teamwork, and real-world skill development in the field of sports medicine and health sciences.

Porterville College

 Address:

100 E College Ave, Porterville, CA 93257

Completed Date: 

2024

Project Team:

Interior Design provided by - CORE

FF&E provided by - CORE


 CORE partnered with Porterville College to support key instructional and healthcare-focused learning environments through the installation of classrooms equipped with powered desks, hospital beds, and specialized lab equipment. The project was designed to enhance hands-on learning, flexibility, and real-world training by providing durable, technology-enabled furnishings that support both academic instruction and clinical education. The completed spaces deliver a functional, modern environment that empowers students and faculty while supporting Porterville College’s commitment to career readiness and educational excellence. 

Immanuel Elementary

 Address:

1128 South Reed Avenue

Reedley , CA 93654

Completed Date: 

2022

Project Team:

Interior Design provided by - CORE

FF&E provided by - CORE


 CORE Business Interiors worked closely with Immanuel Elementary to furnish and enhance key campus spaces, including classrooms, the library, student desking, casegoods, and staff areas. The project focused on creating durable, organized, and inviting interiors that support both learning and daily operations. These thoughtfully designed spaces provide a warm, functional environment that supports educators and encourages student engagement. 

SANGER UNIFIED WAMS

 Address:

1705 10th St, Sanger, CA 93657

Completed Date: 

2024

Project Team:

Interior Design provided by - CORE

FF&E provided by - CORE

Architecture: Mangini


 CORE Business Interiors partnered with Sanger Unified School District to furnish and plan the WAMS administrative offices, creating a functional and professional environment to support district operations. The project included private offices, administrative workstations, conference areas, and coordinated space planning to improve workflow, organization, and collaboration. The completed space delivers a clean, efficient setting that supports staff productivity and reflects the district’s commitment to effective leadership and service. 

AIMS CENTER MAKER STUDIO

 Address:

Fresno, CA

Completed Date: 

2025

Project Team:

FF&E provided by - CORE

Contractor - Quiring

Architect - Paul Halajian 


 The AIMS Center Maker Studio tenant improvement project demoed three existing classrooms to create a studio and training room for educators and students. Support facilities include a janitor's closet, supply storage, restrooms, and a server room. The exterior scope featured comprehensive demolition and regrading, followed by the installation of new concrete featuring three colors, two textures, and an intricate joint pattern. Additional site improvements include a new stair connection to the studio, four cantilevered shade structures, and integrated lounge seating. 

SCCCD WEST FRESNO CAMPUS

 Address:

600 E Church Ave, Fresno, CA 93706

Completed Date: 

2024

Project Team:

Interior Design provided by - CORE

FF&E provided by - CORE


 CORE Business Interiors partnered with the State Center Community College District to furnish and support interior spaces at the West Fresno Campus. The project focused on creating functional, student-centered environments through thoughtfully selected furnishings and layouts that support instruction, collaboration, and daily campus operations. The completed spaces contribute to a modern, welcoming campus setting that supports learning, access, and community engagement. 


Copyright © 2023 CORE - All Rights Reserved.

  • Web Accessibility

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept